Back to overview
Maintenance

update the professional year response

Apr 23 at 04:30pm AEST  –  Apr 23 at 05:00pm AEST
Affected services
api.dev.co-pr.com

Resolved
Apr 23 at 04:30pm AEST

updated the professional year data structure and response of professional year drop down.
Changes:
added isactive and deactivatedon filed in both study field level and branch level. We can know if a studyfield is canceled or a branch stops running.
added validity
period_months in study filed level. give freedom of setting different validity period for different study field.